人妻系列一区二区三区|一区二区综合色视频|久久久久国产一级毛片高清片|日韩中文无线码在线

           
          中文版 English
          HOME | ABOUT US | NEWS | PRODUCTS | PARTNERS | SERVICE | SUPPORT | FEEDBACK | CONTACT US 
            Products Class
          Location: Home ->SUPPORT
          Lean Production in the basic model and the main points:

          Project from the initial to the final project is one of a table, not stagnation process, a person doing the work of many processes produced goods production.
          (1) Segmentation approach
            Can be said that the first stage of a production method, U shaped form to inspect the initial engineering and carried out by an operator, the other way works carried out by other operators.

             Is carried out by one person all the work. That individuals responsible for the project from the initial to the final project.
          3)Circuit mode
            Complex operating there a way to turn back and forth with the same speed。
            Import lean production to meet the following prerequisites. In the import front, the success for the import of these classes should not be in the production field to overcome the lack of conditions.

          ●Complete implementation of the 5S
          ●Established quality assurance system
          ●Production of small LOT      
          ●Engineering (IE) averaged between
          ●Improve work     
          ●Standard operation
          ●To staff training and more     
          ●Import visual management
            Copyright (C) 2010 www.ishec2017.com all rights reserved.
          Add:Gongming Third Industrial Zone, Guangming New Area, Shenzhen
          Tel:+86-0755-27431786 / 0755-36823646 Fax:+86-0755-27129748 E_mail:szsdx@sz-sdx.com 粵ICP備10082684號
          紫云| 吉水县| 施甸县| 托里县| 滦平县| 西乌珠穆沁旗| 资兴市| 郑州市| 六枝特区| 杭锦旗| 鸡西市| 石门县| 仙游县| 德格县| 靖西县| 遵化市| 涟源市| 辽中县| 琼中| 嘉峪关市| 汉川市| 英山县| 花垣县| 山阴县| 霍山县| 革吉县| 武邑县| 商城县| 太仆寺旗| 静海县| 通州市| 元江| 科技| 浠水县| 深泽县| 沂源县| 鱼台县| 会东县| 邵阳市| 辉县市| 铜鼓县|