人妻系列一区二区三区|一区二区综合色视频|久久久久国产一级毛片高清片|日韩中文无线码在线

           
          中文版 English
          HOME | ABOUT US | NEWS | PRODUCTS | PARTNERS | SERVICE | SUPPORT | FEEDBACK | CONTACT US 
            Products Class
          Location: Home ->SUPPORT
          Planning and design of lean production methods:

              Lean the ultimate goal of planning is "to achieve high profitability and comfortable facility." To achieve this it is necessary to improve the logistics of water into the most appropriate production line, so to achieve the most appropriate state. Lean improvements to the logistics of the project targets the improvement of the direct object.
              Lean production planning to advance the design of the basic elements necessary for production of QCD (quality, cost, delivery) were significantly improved. Particularly as the manufacturing industry is facing now such a big age variable, to adapt to drastic changes in market demand, flexible and flexible production systems are particularly important, also for the selection of lean production order to adapt to the needs of the improvement. Implemented lean production (eg right) Indeed implemented by the direct purpose to achieve the ultimate goal, most of the factory color of the belt line or group of vertical lines ordered. In today's era of great change, the use of this mode of production value is there? So to promote lean production, assembly line-style reforms indispensable.

          Belt or group comparison of vertical line and weaknesses (see below table): 

           Merit:  Shortcoming:
           1.Can carry the weight of objects  1.7 invalid place (waste) [production too much, too much holding, handling the invalid, processing itself invalid, semi-finished inventory too much, ineffective action, bad, too many other repair manual
           2.A belt line of the mandatory effect
           3.Decomposition skilled trade jobs  2.Easy operation due to decomposition produces "different lines" of waste
           4.Based on line speed can increase the production  3.Long production cycle and increase the inventory of stocks
           5.On-site supervision of the work can be done carefully  4.Not easy to technology, communication skills
           6.In the stop line when play a catalytic role  5.Little sense of accomplishment and meaning
           7.In the few varieties manufactured in large quantities at very high efficiency  6.Massive investment

            Copyright (C) 2010 www.ishec2017.com all rights reserved.
          Add:Gongming Third Industrial Zone, Guangming New Area, Shenzhen
          Tel:+86-0755-27431786 / 0755-36823646 Fax:+86-0755-27129748 E_mail:szsdx@sz-sdx.com 粵ICP備10082684號
          大邑县| 琼结县| 沾益县| 砀山县| 和顺县| 五莲县| 台安县| 巨鹿县| 稷山县| 新巴尔虎右旗| 承德市| 龙海市| 龙海市| 水城县| 赣榆县| 道孚县| 阳朔县| 元谋县| 常山县| 临江市| 海丰县| 乌苏市| 湘潭市| 自贡市| 平顺县| 玛多县| 四子王旗| 灵宝市| 浮梁县| 张北县| 杭州市| 黄浦区| 沙洋县| 黄浦区| 绿春县| 东辽县| 义马市| 赤水市| 磴口县| 舟曲县| 云林县|